Scope guide: Coverage: Characteristics and applicable drawing notes; Identity: Sample and governing revision; Results: Measured values or clearly defined check outcomes

Contrôle du premier article pour les pièces en fibre de carbone : valider le procès-verbal avant le lancement de la production

Guide éditorial rédigé par Litian Yunde · Mis à jour le 9 octobre 2026

Achats et qualité / Guide des achats

En bref

A first-article inspection record should show which identified part was checked, against which drawing revision, by which agreed methods and with what results. A page marked “passed” is less useful than a record linked to specific requirements. Define the expected report before the sample is made.

Schéma de la portée éditoriale de ce sujet. Les points abordés dans cette synthèse sont également présentés sous forme de texte ci-dessous.

Choose the acceptance characteristics

Identify the dimensions, interfaces, finish references and other requirements that the first article must demonstrate. Distinguish measured results from visual checks or document checks. Do not assume that a supplier’s standard report automatically covers every feature that matters to your assembly.

Make the sample traceable

Record the part identifier, drawing revision and sample or batch reference. Link the inspection report to the actual sample submitted for review. If the sample is modified after inspection, document the change and determine which checks need to be repeated.

Close exceptions explicitly

List out-of-specification results, unmeasured features and agreed deviations clearly. Identify who approves each exception and whether it applies only to the sample or to later production. Keep approval of the first article separate from acceptance of every future batch.

Informations à fournir dans votre demande

Article à évaluerInformations à fournir
CoverageCharacteristics and applicable drawing notes
IdentitéSample and governing revision
ResultsMeasured values or clearly defined check outcomes
ExceptionsDisposition and scope of any approved deviation
Four-step review diagram: Agree report coverage; Identify sample; Record actual results; Close deviations
First-Article Inspection for Carbon Fiber Parts: Agree the Record Before Production — a four-step review checklist.

Foire aux questions

Does a first-article pass accept all later batches?

No. Later production still follows its agreed inspection and acceptance requirements.

Should a modified sample keep the same unqualified report?

Record the modification and review whether affected checks must be repeated.

Parlez-nous de votre composant en fibre de carbone

Veuillez envoyer votre plan révisé, l'application prévue, la quantité souhaitée et les critères d'acceptation à Litian Yunde afin que nous puissions examiner votre projet.

Lancer une demande de devis pour un projet

Guide éditorial rédigé par Litian Yunde. Le périmètre et les critères d'acceptation sont définis au cas par cas pour chaque projet.