Scope guide: Coverage: Characteristics and applicable drawing notes; Identity: Sample and governing revision; Results: Measured values or clearly defined check outcomes

Erstmusterprüfung für Kohlefaserteile: Abstimmung der Protokollierung vor Produktionsbeginn

Redaktionelle Leitlinien von Litian Yunde · Aktualisiert am 9. Oktober 2026

Einkauf & Qualität / Einkaufsleitfaden

Auf einen Blick

A first-article inspection record should show which identified part was checked, against which drawing revision, by which agreed methods and with what results. A page marked “passed” is less useful than a record linked to specific requirements. Define the expected report before the sample is made.

Übersicht über den redaktionellen Umfang dieses Themas. Die Überprüfungsschwerpunkte sind im Folgenden auch in Textform aufgeführt.

Choose the acceptance characteristics

Identify the dimensions, interfaces, finish references and other requirements that the first article must demonstrate. Distinguish measured results from visual checks or document checks. Do not assume that a supplier’s standard report automatically covers every feature that matters to your assembly.

Make the sample traceable

Record the part identifier, drawing revision and sample or batch reference. Link the inspection report to the actual sample submitted for review. If the sample is modified after inspection, document the change and determine which checks need to be repeated.

Close exceptions explicitly

List out-of-specification results, unmeasured features and agreed deviations clearly. Identify who approves each exception and whether it applies only to the sample or to later production. Keep approval of the first article separate from acceptance of every future batch.

Angaben, die Ihre Anfrage enthalten sollte

RezensionsobjektAnzugebende Informationen
CoverageCharacteristics and applicable drawing notes
IdentitätSample and governing revision
ResultsMeasured values or clearly defined check outcomes
ExceptionsDisposition and scope of any approved deviation
Four-step review diagram: Agree report coverage; Identify sample; Record actual results; Close deviations
First-Article Inspection for Carbon Fiber Parts: Agree the Record Before Production — a four-step review checklist.

Häufig gestellte Fragen

Does a first-article pass accept all later batches?

No. Later production still follows its agreed inspection and acceptance requirements.

Should a modified sample keep the same unqualified report?

Record the modification and review whether affected checks must be repeated.

Sprechen Sie über Ihr Carbonbauteil

Senden Sie Ihre überarbeitete Zeichnung, den vorgesehenen Verwendungszweck, die Stückzahl und die Abnahmeanforderungen an Litian Yunde, damit das Projekt geprüft werden kann.

Projektanfrage starten

Redaktionelle Leitlinien von Litian Yunde. Der Umfang und die Abnahmeanforderungen werden für das jeweilige Projekt vereinbart.