Inspection & Testing · Component review guide · Litian Yunde
Retain the location of each finding. Original explanatory schematic; not to scale and not a product test result.
Un rapporto sul lotto pilota dovrebbe collegare ogni problema riscontrato a una parte, una caratteristica e una destinazione d'uso specifiche. È necessario tenere separati i risultati della prima verifica da quelli ottenuti dopo la rilavorazione. In caso contrario, un lotto potrebbe risultare pienamente accettato, mentre le informazioni necessarie per migliorare la produzione in serie andrebbero perse.
Agree the review categories before production
Distinguish dimensional, cosmetic, assembly and documentation findings. State the acceptance basis for each, including any approved sample references. Avoid using a single broad label such as “bad finish” when photographs and a location map could identify a repeatable issue. The goal is a record that supports a decision, not an inflated defect count or a hidden one.
Preserve the original result
Record the part identifier, observation, measurement method and drawing revision before any rework. Separate accepted parts, items awaiting review and rejected items physically or through a reliable status system. A reworked part should retain its identity and the reason for rework. This makes it possible to see whether the process produced the required result on the first pass.
Require an authorised disposition
Use a clear decision path for rework, repair, concession or rejection, as applicable to the contract. These decisions are not interchangeable. An inspector should not turn an unapproved repair into a normal production step by recording only the final appearance. Close the record with the authorised instruction, reinspection result and any change needed before the next batch.

Example: a small run of machined covers
Several covers have the same local edge issue. The team photographs the location and records affected identifiers before deciding on an approved rework. Reinspection results are added without deleting the first-pass findings. The next production review can then compare the original occurrence with the revised process, rather than merely reading that every shipped cover eventually passed.
Scenario illustrativo, non un caso reale di un cliente né un risultato di produzione riportato.
Dettagli da concordare prima di effettuare l'ordine
| Articolo in recensione | Registrare per confermare |
|---|---|
| Identification | Part/lot, drawing revision and inspection stage. |
| Finding | Location, category, evidence and acceptance reference. |
| Disposition | Authorised action and responsible approval. |
| Chiusura | Reinspection, release status and process follow-up. |
Domande poste dagli acquirenti
Should successfully reworked parts count as first-pass acceptance?
No. Report their accepted final state while preserving the fact that rework was required.
Does a pilot batch establish long-term process capability?
Not by itself. Its size, sampling plan and production representativeness limit the conclusion.
Nozioni tecniche e letture consigliate
Risorsa di riferimento: NIST: Caratterizzazione dei processi di misurazione. La checklist del progetto e l'esempio riportati sopra costituiscono linee guida redazionali; il presente documento non certifica alcun componente Litian Yunde.
- Dal prototipo in fibra di carbonio alla produzione in serie: il pacchetto di passaggio di consegne
- Controllo degli attrezzi di misurazione per componenti in fibra di carbonio: cosa significa un risultato “Go/No-Go”
- Esplora il centro informazioni sulla fibra di carbonio
Rivedi il tuo componente con Litian Yunde
Indica la revisione del disegno, l'applicazione prevista e la questione relativa all'interfaccia o al collaudo che devi risolvere. I requisiti di costruzione e di accettazione citati sono confermati per il progetto specifico.
