Inspection & Testing · Component review guide · Litian Yunde
Концепт, созданный с помощью искусственного интеллекта; это не фотография продукта компании Litian Yunde и не утвержденный дизайн.
Acceptance sampling needs an identified lot, a specified characteristic and an agreed decision plan. For a carbon fiber shipment, define the population before selecting samples. Checking a convenient handful of parts is not automatically a statistical acceptance plan, and a first-article result does not itself accept every later shipment.
Describe what belongs to the lot
Record the item reference, applicable version, quantity and any process or material grouping required by the order. If one shipment contains different constructions or revisions, review whether they belong to separate lots. Do not make the receiving box the only lot definition when it mixes different populations. Keep the selected samples linked to their lot and preserve required serial or batch identities.
Agree the characteristic and decision rule
Appearance, hole position, wall thickness and documentation checks may require different methods and coverage. State which characteristics the sampling plan addresses and what requires other inspection. A competent quality owner should select any applicable standard, sample size, acceptance/rejection numbers and selection method. This article does not invent an AQL or sample quantity. Sampling involves producer and consumer risks, so the plan should be part of the agreement rather than chosen after a defect is found.
Keep disposition specific to the evidence
Record how samples were selected, the findings and the decision against the approved plan. If the lot is held, document its next route without silently removing defective pieces and declaring the rest accepted. Screening, rework and resubmission need defined instructions and traceable records. Keep first-article approval, routine lot acceptance and any performance-validation requirements separate, even when they concern the same component reference.

Example: two versions in one delivery
A shipment contains an earlier and a later cover version. The receiver initially proposes one sample count for the whole box. The review separates the populations and applies the agreed requirements to each identified lot. The resulting record shows which version and quantity each decision covers.
Это примерный сценарий, а не реальный случай из практики клиента или официально опубликованные производственные результаты.
Детали, которые необходимо согласовать перед оформлением заказа
| Обзор товара | Зафиксировать для согласования |
|---|---|
| Population | Item, revision, construction and lot quantity. |
| Объем покрытия | Characteristic and inspection method. |
| Plan | Approved selection and acceptance/rejection rules. |
| Характер | Lot-specific decision and resubmission route. |
Вопросы, которые задают покупатели
Is first-article approval a shipment sampling plan?
No. It addresses a different purpose and does not replace the agreed routine lot acceptance process.
Can the sampling plan be changed after seeing defects?
Changing the plan after the results can change the decision basis. Use an authorised, documented process.
Техническая информация и рекомендуемая литература
Справочный материал: NIST: Lot Acceptance Sampling. Только для ознакомления; контрольный список проекта является редакционным руководством, и данный документ не служит основанием для сертификации поставщика или утверждения деталей.
- Входной контроль деталей из углеродного волокна: согласование протокола до начала производства
- Поступающие детали из углеродного волокна: настройка рабочего процесса «удержание и отпуск»
- Ознакомьтесь с информационным центром по углеродному волокну
Обсудите свой компонент с Литянь Юнде
Сообщите нам о внесениях в чертеж, предполагаемом применении, а также о вопросах, касающихся интерфейса или приемки, которые необходимо решить. Приведенные требования к конструкции и приемке подтверждены для данного конкретного проекта.
