Incoming carbon fiber components should have a clear receiving status before they become available for assembly. Identify the shipment, separate items awaiting inspection or disposition, and record who can release them. A delivery note or visually tidy packaging does not itself establish that the ordered requirements have been met.
Identify the receipt before distributing parts
Record the order, shipment reference, component identities and quantities against the applicable requirement set. Keep lot or serial information where supplied and required. If a shipment contains different versions or components, preserve that distinction. A shared stock bin can erase the connection between a finding and the original receipt. Do not use an arrival date as a substitute for a supplier lot identity.
Give held items a controlled route
Separate items awaiting inspection, missing documentation or technical disposition from available stock. A physical area and a record can work together, but their status must agree. State what is missing and who resolves it. Avoid describing a hold as a final rejection when the question remains open. If a part is moved for assessment, maintain its identity and prevent that movement from silently releasing it.
Release only the scope supported by the record
Define the inspection and documentation checks required for the specific order. Record authorised acceptance, conditional disposition or rejection with the responsible person’s decision. If additional work is approved, preserve the original finding and the reinspection evidence. A partial release should identify exactly which quantities or identities are available. Close the receiving record without overwriting the audit trail of unresolved or returned items.

Example: parts arrive before the inspection report
The count and labels match the order, but an agreed inspection report is missing. The receiving team records the receipt and keeps the affected parts on hold. After the report is reviewed and the required checks are completed, an authorised release identifies the available quantity. The shipping arrival is not retrospectively described as the acceptance date.
Это примерный сценарий, а не реальный случай из практики клиента или официально опубликованные производственные результаты.
Детали, которые необходимо согласовать перед оформлением заказа
| Обзор товара | Зафиксировать для согласования |
|---|---|
| Receipt | Order, shipment, identities and quantities. |
| Status | Awaiting inspection, held or available. |
| Decision | Authorised scope and unresolved questions. |
| Закрытие | Release, return or approved rework history. |
Вопросы, которые задают покупатели
Is a receiving hold the same as rejecting the supplier’s work?
No. It can mean inspection or documentation is incomplete. State the reason and the required next decision.
Can production use a held part to avoid delay?
Any conditional use needs an authorised, recorded disposition appropriate to the requirement.
Техническая информация и рекомендуемая литература
Справочный материал: ISO/TC 176: Documented Information Guidance (2015 edition). Только для ознакомления; контрольный список проекта является редакционным руководством, и данный документ не служит основанием для сертификации поставщика или утверждения деталей.
- Пробные партии изделий из углеродного волокна: регистрация дефектов без потери истории деталей
- Customer-Supplied Hardware for Carbon Fiber Parts: Define the Handover
- Ознакомьтесь с информационным центром по углеродному волокну
Обсудите свой компонент с Литянь Юнде
Сообщите нам о внесениях в чертеж, предполагаемом применении, а также о вопросах, касающихся интерфейса или приемки, которые необходимо решить. Приведенные требования к конструкции и приемке подтверждены для данного конкретного проекта.