Filter posts by category

Purchasing & Project Control

Buying and managing custom composite components: quotations, material documents, approved definitions, handovers, logistics and repeat-order control.

A local mould repair is mapped to the corresponding region of the next represented component.

Repairs to Composite Moulds: Keep the Changed Tool Surface with the Next Sample

A repair to a mould surface should remain visible in the tool history and the next relevant sample review. Identify where the work occurred and which part features it can affect. A tool returning from maintenance is not evidence that every previous sample characteristic remains unchanged.

Repairs to Composite Moulds: Keep the Changed Tool Surface with the Next Sample Read More »

Humidity, impact and multi-condition devices represent different monitoring scopes on a package.

Shipment Indicators on Carbon Fiber Packages: Record What the Device Actually Monitors

A humidity indicator, an impact indicator and a multi-condition logger do not provide the same evidence. If monitoring devices are included in a carbon fiber shipment, identify the device and its configured scope. A label on a carton is not a complete inspection of the parts inside.

Shipment Indicators on Carbon Fiber Packages: Record What the Device Actually Monitors Read More »